PROJECTS

Ordos Hangjin Banner Wind Power Project

Release Date:2023-10-13

Reading volume:

Ordos Hangjin Banner Wind Power Project

Project Overview

Hangjin Banner Renewable Energy Base, Ordos City, Inner Mongolia Autonomous Region.

Water Production Standard

Project scale

The installed capacity is 100MW, and two areas A and B are planned to be constructed.

Technology

The principle of wind power generation is to use wind power to drive the blades of a windmill to rotate, and then increase the speed of rotation through a booster engine to drive the generator to generate electricity. Simply put, wind power generation is the process of converting wind energy into mechanical energy, and then converting mechanical energy into electrical energy. This process does not require fuel or radiation, nor does it generate air pollution, making it a clean energy source.

TOP